Fire regulations for battery energy storage (BESS) in Poland: distances and permits

A guide by AIESS engineers based on the draft Polish technical-conditions regulation of 6 August 2026 and the Building Law in force. Every statement is labelled: draft text, law in force, AIESS interpretation or insurer practice.

AIESS engineering team · Published: · Updated:

AI assistant: ask about your case

Fire-regulations assistant

Available · Draft WT of 6.08.2026 and the AIESS guide

Hello! I can work out fire-safety distances, the capacity class and the permit procedure for your energy storage. Give me the capacity and surroundings and I will draw an indicative layout sketch.

Enter to send · Shift+Enter for a new line

We store questions and answers anonymously (no IP address) for 180 days to improve the assistant. Do not enter personal data. This is information, not legal advice or a fire-safety design. Privacy policy

The key facts in 30 seconds

A free-standing battery energy storage system up to 300 kWh must stand at least 4 m from a building, 300–2000 kWh – 8 m, 2000–5000 kWh – 15 m, above 5000 kWh – 20 m (from ZL, IN and PM buildings with fire load Q ≤ 1000 MJ/m²). These values come from the draft Polish technical-conditions regulation (WT) of 6.08.2026 (§ 283 sec. 16–21), which is not yet in force – until about 20.03.2028 the 2002 regulation applies, with no BESS rules. The permit route already follows the Building Law in force: up to 30 kWh no formalities, up to 2000 kWh a notification with a fire-approved design, above 2000 kWh a building permit.

  • Draft regulation – textAlways at least 4 m from windows, doors, skylights and ventilation openings of a building, and 1.5 m from the plot border. (§ 283 sec. 19–20)
  • Draft regulation – textStorage units closer than 3 m to each other count as one – capacities add up, unless separated by a REI 120 wall projecting 0.3 m. (§ 283 sec. 18)
  • Draft regulation – textFrom a forest (Ls land > 0.5 ha): 8 / 12 / 22.5 / 30 m for the four capacity classes; fire walls do not shorten it. (§ 283 sec. 21)
  • Draft regulation – textNext to the building it supplies (closer than 4 m or on its wall): at most 120 kWh in total; on a flat roof at most 600 kWh. (§ 317 sec. 3)
  • Law in forceStorage above 30 kWh needs a design approved by a fire-safety expert and a notice to the State Fire Service (PSP) with a plan for rescuers. (Building Law art. 29–30 (Dz.U. 2025 item 1847))
  • Insurer practiceInsurers (PZU, SALTUS) often require at least 10 m from buildings or a REI 120 wall – more than the 4 m in the draft for a small cabinet.

Legal status: what applies today

  • Law in forceThe draft regulation of 6.08.2026 has not been signed or published; the planned entry into force on 20.09.2026 did not happen. (Ministry (MRiT) communiqué of 18.09.2026)
  • Law in forceFor 18 months from 20.09.2026 (until about 20.03.2028) the previous technical conditions apply – WT 2002. The investor declares that the design follows the previous rules. (Dz.U. 2026 item 1161, Building Law art. 102a–102c)
  • Law in forceWT 2002 has no provisions on energy storage. Requirements are agreed with a fire-safety expert; the Interior Ministry treats Li-ion storage as PM (production/storage) zones. (WT 2002, MSWiA 2010, MSWiA 2009)
  • Draft regulation – textThe wording of § 283 sec. 16–21 has been unchanged since the 24.04.2026 version, and the ministry, answering parliamentary question 19406, does not plan to change the 600 kWh limit. (question 19406)
  • AIESS interpretationAIESS designs layouts to the draft – the best available "future standard" and a strong argument in fire approvals. Always check whether the regulation has been published before filing.

Storage capacity classes

A BESS is a storage system with secondary cells and a nominal capacity above 2 kWh (§ 311 sec. 1). Distances depend on the total nominal capacity of the group. Thresholds are "not greater than": 300.0 kWh is still the ≤ 300 kWh class.

ClassNominal capacityTreated as a PM building with QTypical product
≤ 300 kWh> 2 to 300 kWh– (fixed 4 m)261 kWh cabinet, 120 kWh hybrid
300–2000 kWh> 300 to 2000 kWhQ ≤ 1000 MJ/m²2–7 cabinets side by side
2000–5000 kWh> 2000 to 5000 kWh1000 < Q ≤ 4000 MJ/m²2.5–5 MWh container
> 5000 kWhabove 5000 kWhQ > 4000 MJ/m²2 containers side by side
  • AIESS interpretationWe use the nominal capacity from the datasheet, not the usable capacity (DoD). (Q11)

Distance from a building

Storage above 300 kWh is treated as the wall of a PM building with a fire load density Q that depends on capacity, and the distance is read from the table in § 283 sec. 1. Storage up to 300 kWh stands at least 4 m from a building. Base values, without corrections:

Neighbouring building ↓ / storage →≤ 300 kWh300–2000 kWh2000–5000 kWh> 5000 kWh
ZL – residential, office, retail4 m8 m15 m20 m
IN – livestock4 m8 m15 m20 m
PM, Q ≤ 1000 MJ/m²4 m8 m15 m20 m
PM, 1000 < Q ≤ 4000 MJ/m²4 m15 m15 m20 m
PM, Q > 4000 MJ/m²4 m20 m20 m20 m
Window, door, skylight, ventilation opening4 m4 m4 m4 m

§ 283 ust. 1, 16–17, 19

  • Draft regulation – textThe distance is measured horizontally, at the nearest point, from the storage enclosure. (§ 9 sec. 3)
  • AIESS interpretationWe measure from the outer outline of the enclosure including protruding parts (HVAC unit, canopy, vent panels). (Q16)
  • AIESS interpretationA transformer station counts as PM under § 220 sec. 3, but according to the Supreme Administrative Court (II OSK 704/24) a compact container substation is a structure, not a building – then the distance follows IEC 61936-1 (e.g. 3 m for 1000–2000 l of oil). (Q1)

Distance corrections (storage above 300 kWh)

Corrections apply to distances from buildings, in this order:

ConditionChangeBasis
The neighbouring wall facing the storage is not non-flammable (NRO)× 1.5§ 283 sec. 2 pt 1
The neighbouring roof covering is not NRO (no BROOF(t1))× 1.5§ 283 sec. 2 pt 2
The condition applies to both objects (storage enclosure also not NRO)× 2§ 283 sec. 2
Neighbouring wall has fire class E on 30–65% of its area (many windows, gates)× 1.5§ 283 sec. 3
Neighbouring wall has fire class E on less than 30% of its area× 2§ 283 sec. 4
An explosion-hazard room in either objectmin. 20 m§ 283 sec. 5
Sprinklers in all fire zones of the neighbour along that wall× 0.75 (last)§ 283 sec. 6

d = max(d_base × k_NRO × k_openings; 20 m if explosion hazard) × 0.75 (if sprinklers), then at least 4 m from openings.

  • Draft regulation – textSec. 16 refers only to sec. 1–6, so the 50% reduction (sprinklers in both buildings, sec. 7) and the 25% reduction for § 224 buildings (sec. 10) do not apply. (§ 283 sec. 16)
  • AIESS interpretationA steel cabinet or container enclosure is NRO. A non-NRO wall and roof of the same building give × 1.5, not × 2.25. (Q12)
  • AIESS interpretationWe do not apply corrections to the fixed 4 m for storage up to 300 kWh. (Q9)
  • AIESS interpretationSuppression inside the container (aerosol, FK-5-1-12) does not give the 25% reduction – only sprinklers in the fire zones of the neighbouring building count. (Q18)

The 3 m rule: when several units count as one

  • Draft regulation – textFree-standing storage units less than 3 m apart are treated as one unit with a capacity equal to the sum. (§ 283 sec. 18)
  • Draft regulation – textThis does not apply to units separated by a fire wall of at least REI 120 projecting at least 0.3 m vertically and horizontally beyond their outline. (§ 283 sec. 18)
  • AIESS interpretationSpacing cabinets ≥ 3 m apart follows directly from the text, so each 261 kWh cabinet stands 4 m from a building. A chain A–B < 3 m and B–C < 3 m is cautiously treated as one group A+B+C. (Q4)
  • AIESS interpretationSpacing does not change the Building Law route: cabinets on a shared PCS / EMS are one storage system (sum of kWh). (Q19)
The 3 m rule: cabinets closer than 3 m add up to one storage unit; ≥ 3 m apart or behind a REI 120 wall, each counts separately< 3 m → 1 unit of 1044 kWh → 8 m≥ 3 m≥ 3 m≥ 3 m≥ 3 m → 4 × 261 kWh → 4 m eachREI 120 + 0.3 m → 4 m each
The 3 m rule: cabinets closer than 3 m add up to one storage unit; ≥ 3 m apart or behind a REI 120 wall, each counts separately

Plot border and forest

From any plot border – at least 1.5 m. From the border of an unbuilt building plot – half the distance to a hypothetical building: a ZL building where there is no local zoning plan (MPZP), otherwise as zoned (for PM, 1000 < Q ≤ 4000 is assumed).

StorageAny borderUnbuilt building plot – no MPZP / MPZP ZL, INUnbuilt building plot – MPZP PM
≤ 300 kWh1.5 m2 m2 m
300–2000 kWh1.5 m4 m7.5 m
2000–5000 kWh1.5 m7.5 m7.5 m
> 5000 kWh1.5 m10 m10 m

A forest is Ls land in the land register or forest in the zoning plan, forming a complex above 0.5 ha. The distance is calculated as from the wall of a ZL building with a non-NRO roof (hence × 1.5).

StorageDistance from the forest edgeCalculation
≤ 300 kWh8 mfixed value (sec. 21 sent. 2)
300–2000 kWh12 m8 m × 1.5
2000–5000 kWh22.5 m15 m × 1.5
> 5000 kWh30 m20 m × 1.5
  • Draft regulation – textThe rules on land strips and fire walls (sec. 11–13) do not apply next to a forest. (§ 283 sec. 21)
  • AIESS interpretationA built-up plot, farmland without building rights or a road: 1.5 m from the border plus the distance to existing buildings. (Q6)
  • AIESS interpretationHalf the distance from an unbuilt plot is calculated without corrections – the hypothetical building has an "ideal" wall. (Q15)

Storage next to a building, on a wall and on a roof

ParameterValue
Total closer than 4 m to the building and on its wall≤ 120 kWh
Total on a flat roof≤ 600 kWh
Group on a wall more than 2 m above ground≤ 30 kWh
Group on a flat roof≤ 120 kWh
Spacing between groups1.5 m horizontally, 3 m vertically (on a roof or an EI 120 wall + 0.3 m)
From windows, doors, skylights, ventilation1.5 m
From escape doors (buildings other than § 224)3 m
Wall of class A1 or A2,d0 (buildings other than § 224)1.5 m around and 3 m above the enclosure
From the roof edge, hatches, equipment / from a smoke vent1.5 m / 1 m
More than 25 m above groundonly on a wall with fixed suppression or on a REI 60 A1/A2,d0 roof
  • Draft regulation – text§ 317 sec. 3 applies to storage installed outside a building closer than 4 m to it, on its wall or on its roof. (§ 317 sec. 3, § 313 sec. 4–5)
  • Draft regulation – textInside a building not used only for storage: at most 600 kWh per fire zone; in a flat in a multi-family building: at most 11 kWh and 3.7 kW. (§ 313 sec. 1, § 318)
  • AIESS interpretationAny cabinet above 120 kWh (e.g. 261 kWh) can only stand free, at least 4 m from a building. Keep two 120 kWh hybrids ≥ 3 m apart – otherwise they form a 240 kWh group. (Q5)

Procedure: notification or building permit

These rules are already in force (Building Law amendment, Dz.U. 2025 item 1847). They apply to free-standing storage, by nominal capacity.

CapacityRouteFire-safety approvalNotice to fire serviceBasis
≤ 30 kWhno permit or notification––art. 29 sec. 2 pt 39
> 30 to 300 kWhnotification + site plan (PZT)site plan fire-approvedyes, with a plan for rescuersart. 29 sec. 1 pt 40, art. 30
> 300 to 2000 kWhnotification with site plan and architectural design (PAB)site plan and design fire-approvedyesart. 29 sec. 1 pt 3c, art. 30 sec. 4bb
> 2000 kWhbuilding permitgeneral rules (MSWiA 2023)general rulesart. 28 sec. 1
  • AIESS interpretationThe Building Law has no aggregation rule. Cabinets on a shared PCS, grid connection or EMS are treated as one storage system. Around 2 MWh, when in doubt, choose the permit route. (Q19)
  • Law in forceAn explosion-hazard room (possible pressure rise > 5 kPa) means 20 m from buildings already today (WT 2002 § 271 sec. 3); the investor, designer or user makes the assessment, and alternative solutions are not allowed. (MSWiA 2010 § 37)
  • Law in forceA container farm may need a fire access road (4 m wide, 100 kN per axle) and firefighting water of 10–20 dm³/s. (MSWiA 2009 § 3, § 12–13)
  • Law in forceNight-time noise at protected areas: 40 dB next to single-family housing, 45 dB next to multi-family and farmstead housing – often stricter than fire rules. (Dz.U. 2014 item 112)

Worked examples

Results come from the same rules engine the AI assistant uses.

261 kWh cabinet next to a factory hall

PM hall, Q = 1500 MJ/m², NRO walls and roof, a gate in the wall facing the storage.

from building
4 m
from border
2 m
procedure
notification

Up to 300 kWh: a fixed 4 m from the hall and 4 m from the gate; corrections do not apply. Procedure: notification with a fire-approved site plan.

Four 261 kWh cabinets side by side (1044 kWh)

PM hall, Q = 800 MJ/m², PIR roof without BROOF(t1), wall with class E on 55% of its area, no sprinklers.

from building
18 m
from border
4 m
procedure
notification

8 m × 1.5 (non-NRO roof) × 1.5 (openings) = 18 m. The same hall with sprinklers: 13.5 m. Cabinets ≥ 3 m apart or separated by REI 120: 4 m each.

5 MWh container on a PV farm next to a forest

Barn (IN) with a timber wall, 12 ha Ls forest, unbuilt building plot zoned PM.

from building
22.5 m
from forest
22.5 m
from border
7.5 m
procedure
building permit

Barn: 15 m × 1.5 = 22.5 m. Forest: 22.5 m. Border with the PM plot: 7.5 m. Two containers closer than 3 m: 30 m from the forest.

3.34 MWh container next to a neighbour’s house

Single-family house (ZL) with a timber façade (non-NRO), ceramic tile roof (NRO).

from building
22.5 m
from border
1.5 m
procedure
building permit

15 m × 1.5 = 22.5 m from the house. Two groups of ≤ 2000 kWh spaced ≥ 3 m apart: 12 m. Procedure: building permit; check night-time noise (40 dB).

Drawings from the draft regulation annexes

AIESS diagrams

Distance of free-standing storage from a ZL / IN / PM Q ≤ 1000 building by capacity class (no corrections)4 m4 m · ≤ 300 kWh8 m8 m · ≤ 2000 kWh15 m15 m · ≤ 5000 kWh20 m20 m · > 5000 kWhBESS20 m
Distance of free-standing storage from a ZL / IN / PM Q ≤ 1000 building by capacity class (no corrections)

Drawings from annexes 3, 11 and 13 of the draft – the geometry of land strips, fire walls and distances from the border.

Annex 13 fig. 1 – land strip around a wall (§ 283 sec. 11)
Annex 13 fig. 1 – land strip around a wall (§ 283 sec. 11)
Annex 13 fig. 2 – walls at 60–120°: strip of half width (§ 283 sec. 12)
Annex 13 fig. 2 – walls at 60–120°: strip of half width (§ 283 sec. 12)
Annex 13 fig. 3 – fire wall and angle over 120° (§ 283 sec. 13)
Annex 13 fig. 3 – fire wall and angle over 120° (§ 283 sec. 13)
Annex 11 fig. 1 – projection of a fire wall (§ 246)
Annex 11 fig. 1 – projection of a fire wall (§ 246)
Annex 3 fig. 5 – walls relative to the plot border
Annex 3 fig. 5 – walls relative to the plot border
Annex 3 fig. 3 – wall with a window or door facing the border
Annex 3 fig. 3 – wall with a window or door facing the border

Beyond the regulation: insurers and standards

  • Insurer practicePZU: at least 10 m from buildings (20 m recommended), 6 m between storage units, water of at least 20 l/s.
  • Insurer practiceSALTUS (storage > 20 kWh): 10 m from buildings or a REI 120 wall; hydrogen detection at 10% LEL; complexes ≤ 500 m², 10 m apart.
  • Insurer practiceFM Global DS 5-33 (04.2026): LFP – 1.5 m from walls with doors or vents, NMC – 4.0 m; containers above 46.5 m² treated as buildings.
  • AIESS interpretationNFPA 855 (US) requires 3 m (10 ft) from buildings and borders, reducible to 0.9 m with a fire barrier – the Polish draft is stricter. NFPA arguments and UL 9540A reports are useful in expert opinions.
  • Law in forceSince 18.08.2024 stationary storage systems must meet art. 12 of Regulation (EU) 2023/1542 – 11 safety test parameters (Annex V). (EU 2023/1542)
  • AIESS interpretationBefore finalising a layout, ask the client about their property insurer – a cabinet 4 m from a hall, compliant with the draft, may not meet the policy terms.

Open questions in the draft

Places where the text is ambiguous, with AIESS’s working interpretation and its confidence.

#QuestionAIESS interpretationConfidence
Q1Is an MV/LV substation a PM building?Compact container substation – a structure (NSA II OSK 704/24), distance per IEC 61936-1; masonry with indoor operation – cautiously a PM building.medium
Q2Is a BESS container an explosion-hazard room (20 m)?Not automatically – a documented ΔP ≤ 5 kPa calculation decides (gas data from UL 9540A, NFPA 69 ventilation).medium
Q3Is a container a building?No – it is a "free-standing energy storage" (NSA II OSK 975/26: technical infrastructure equipment).high
Q4Is ≥ 3 m spacing a legal workaround?Yes, it follows from the text; chains < 3 m – cautiously one group.high
Q5Storage next to a building + another < 3 m from itAvoid – keep ≥ 3 m between them.low
Q6Border with farmland, a road, a built-up plot1.5 m from the border (plus distance to existing buildings).medium
Q7Building used only for BESSAs a PM building; inside: fire alarm, fixed suppression, groups ≤ 120 kWh.medium
Q8Free-standing REI 120 wall between storage and a buildingIn principle shortens the distance (Annex 13 fig. 3); geometry to be agreed; not for forests.medium / low
Q9Corrections for the fixed 4 m (≤ 300 kWh)Not applied; 4 m from openings still applies.medium / high
Q10Class E share in a § 224 building wallUse the share of openings: > 35% × 1.5, > 70% × 2.low / medium
Q11Nominal or usable capacityNominal, from the datasheet.high
Q12Order of correctionsMultiply sec. 1 × sec. 2 × sec. 3/4, then max with 20 m, finally × 0.75.medium
Q13§ 285 (buildings on one plot)Does not cover storage – distances apply to the investor’s own buildings too.medium
Q14Emergency switch on a farm without a buildingFormally not required; AIESS always installs one (at the gate, AC + DC).high
Q15Half distance from a plot – with corrections?No corrections for the hypothetical building.medium / high
Q16Where to measure fromFrom the enclosure outline including protrusions, horizontally.high
Q17PCS / transformer < 3 m from storageNot aggregated (no batteries); distances per manufacturer.medium
Q18Sprinklers and the 25% reductionOnly if every neighbouring zone along the wall is sprinklered; suppression in the BESS does not count.high
Q19Aggregation for Building Law thresholdsShared PCS / EMS = one storage system; 3 m spacing does not change the route.medium
Q20What to apply todayLayout per the draft; formally WT 2002, MSWiA 2010/2009, Building Law art. 29–30.medium

Frequently asked questions

Sources

Legal acts and official documents behind this guide. Links go to ISAP (Polish Parliament), RCL, gov.pl and EUR-Lex; titles are in Polish.

  1. Projekt rozporządzenia Ministra Finansów i Gospodarki w sprawie warunków technicznych, jakim powinny odpowiadać budynki i ich usytuowanie (projekt z 6.08.2026), nr RCL 12412604 – Rządowe Centrum Legislacji
  2. Pierwotny projekt rozporządzenia MRiT w sprawie warunków technicznych (9.06.2025), nr RCL 12398903 – Rządowe Centrum Legislacji
  3. Ustawa z 4 grudnia 2025 r. o zmianie ustawy – Prawo budowlane oraz niektórych innych ustaw (Dz.U. 2025 poz. 1847) – Sejm RP – ISAP
  4. Ustawa z 31 lipca 2026 r. o zmianie ustawy o samorządach zawodowych architektów oraz inżynierów budownictwa oraz ustawy – Prawo budowlane (Dz.U. 2026 poz. 1161) – Sejm RP – ISAP
  5. Prawo budowlane – tekst jednolity (Dz.U. 2026 poz. 524), art. 9, 28–30 – Sejm RP – ISAP
  6. Komunikat MRiT z 18.09.2026 dotyczący prac nad rozporządzeniem w sprawie warunków technicznych – Ministerstwo Rozwoju i Technologii
  7. Rozporządzenie Ministra Infrastruktury z 12 kwietnia 2002 r. w sprawie warunków technicznych, jakim powinny odpowiadać budynki i ich usytuowanie (WT 2002) – Sejm RP – ISAP
  8. Rozporządzenie MSWiA z 7 czerwca 2010 r. w sprawie ochrony przeciwpożarowej budynków, innych obiektów budowlanych i terenów (t.j. Dz.U. 2023 poz. 822), § 37 – Sejm RP – ISAP
  9. Rozporządzenie MSWiA z 24 lipca 2009 r. w sprawie przeciwpożarowego zaopatrzenia w wodę oraz dróg pożarowych – Sejm RP – ISAP
  10. Rozporządzenie MSWiA z 5 sierpnia 2023 r. w sprawie uzgadniania projektu pod względem zgodności z wymaganiami ochrony przeciwpożarowej (Dz.U. 2023 poz. 1563) – Sejm RP – ISAP
  11. Ustawa o ochronie przeciwpożarowej – tekst jednolity (Dz.U. 2025 poz. 188), art. 6a – Sejm RP – ISAP
  12. Rozporządzenie Ministra Środowiska w sprawie dopuszczalnych poziomów hałasu w środowisku (t.j. Dz.U. 2014 poz. 112) – Sejm RP – ISAP
  13. Interpelacja nr 19406 i odpowiedź MRiT z 8.10.2026 (limit 600 kWh, magazyny na zewnątrz) – Sejm RP
  14. Rozporządzenie (UE) 2023/1542 w sprawie baterii i zużytych baterii, art. 12 i załącznik V – EUR-Lex
  15. Normy i standardy (płatne, cytowane za opracowaniami): NFPA 855 (2023/2026), UL 9540A, IEC 61936-1, FM Global DS 5-33, PN-EN 13501-1, PN-B-02852:2001 – NFPA, UL, IEC, FM Global, PKN

This guide is for information only and is not legal advice or a fire-safety design. Solutions for a specific project are decided by the designer and a certified fire-safety expert (rzeczoznawca ds. zabezpieczeń przeciwpożarowych).

Talk to an AIESS engineer

We design and install outdoor energy storage – from 261 kWh cabinets to MWh containers. We will check the layout, distances and procedure for your site.