Case studies
AIESS batteries run in Polish plants and on PV farms. We publish a case study only once the results are measured.
- sites in operation
- 6
- run by AIESS EMS
- 3.5 MWh
- in progress at 2 more sites
- 7 MWh
- distinction for AIESS Cloud
- ENEX 2026
The first write-ups are in preparation. Each one is based on fleet data, not estimates.
Site and challenge
Industry, region, peak demand and what hurt on the bill.
Solution
Battery model, AIESS EMS modes and site limits, such as an export cap.
Measured results
Only measured figures, always with the period they cover.
Anonymous
No client name unless the client agrees in writing.
A calculation on your meter data shows the result for your site.