Case studies

AIESS batteries run in Polish plants and on PV farms. We publish a case study only once the results are measured.

sites in operation
6
run by AIESS EMS
3.5 MWh
in progress at 2 more sites
7 MWh
distinction for AIESS Cloud
ENEX 2026

The first write-ups are in preparation. Each one is based on fleet data, not estimates.

Site and challenge

Industry, region, peak demand and what hurt on the bill.

Solution

Battery model, AIESS EMS modes and site limits, such as an export cap.

Measured results

Only measured figures, always with the period they cover.

Anonymous

No client name unless the client agrees in writing.

A calculation on your meter data shows the result for your site.