Energy market · costs
Poland’s capacity fee in 2026 and 2027 — rates, hours and how to cut it
The capacity fee (opłata mocowa) funds Poland’s capacity market. Businesses billed per kWh pay 0.2194 PLN/kWh net in 2026 for grid energy taken on working days from 7:00 to 22:00. In 2027 the rate is set per quarter: 0.1925 to 0.2141 PLN/kWh. The amount is multiplied by a factor of 0.17, 0.50, 0.83 or 1, depending on how flat the load profile is on each working day.
- 0.2194 PLN/kWh2026 rate (net)
- 0.1925–0.2141PLN/kWh in 2027, set per quarter
- 7:00–22:00working days, 15 hours
- 17–100 %of the rate, by band K1–K4
Working-day simulator
How a battery shifts grid draw and changes the K band
The capacity fee depends on the shape of the day: how much a business takes from the grid between 7:00 and 22:00 compared with the rest of the day. A correctly sized battery cuts it by about 80 %: moving from K4 to K1 saves 182 PLN on every MWh drawn between 7:00 and 22:00 (2026 rate). Pick an example or drag the bars and watch the band and the fee change.
A two-shift plant with no generation of its own and a 1 MWh battery. The battery discharges between 7:00 and 22:00 and recharges from the grid at night. AIESS EMS sizes the shift so the day lands in K1.
Drag a bar up or down to change the plant’s load in that hour.
- Fee per working day
- 251.26 PLN
- Fee per year 2026
- 63,570 PLN
362,733 PLN less than with no PV and no battery
The battery moves 943 kWh from 7:00–22:00 to the night
Illustrative model: every working day like the one on the chart, a 1 MWh / 250 kW battery at 90 % round-trip efficiency, 400 kWp of PV on a sunny day. On a cloudy day PV helps less and the battery shifts more. Charging energy cost and distribution charges are left out. The band is set separately for each day.
What the simulation shows
- With no PV and no battery the plant draws 64.3 % more on average between 7:00 and 22:00 than at night, so every working day lands in K4 and pays the full rate: 426,303 PLN a year.
- PV lowers the fee to 324,612 PLN because it cuts draw in the fee hours. The difference of averages is still 25.4 %, so the band does not change.
- A battery moves part of the draw to the night: 943 kWh a day is enough to reach K1 and pay 17 % of the rate — 63,570 PLN a year.
- With PV the battery only has to move 326 kWh a day, and the fee falls to 52,112 PLN a year.
| Example | Average 7–22 | Average other hours | Difference s | Band | Per day | Per year |
|---|---|---|---|---|---|---|
| No PV + battery | 449 kW | 428 kW | 4.9 % | K1 | 251.26 PLN | 63,570 PLN |
| No PV | 512 kW | 312 kW | 64.3 % | K4 | 1,684.99 PLN | 426,303 PLN |
| PV + battery | 368 kW | 351 kW | 4.9 % | K1 | 205.98 PLN | 52,112 PLN |
| With PV | 390 kW | 311 kW | 25.4 % | K4 | 1,283.05 PLN | 324,612 PLN |
What the capacity fee is
The capacity fee is a line on the electricity bill that funds the capacity market. Power plants, energy storage and demand-response providers are paid from it for being ready to deliver during the system’s peak hours.
The legal basis is the Capacity Market Act of 8 December 2017 (consolidated text: Journal of Laws 2026 item 1400). The distribution system operator collects it on the distribution invoice or the combined supply invoice. The President of URE, the energy regulator, sets the rates every year. Switching supplier does not change it.
Capacity fee rates for 2026 and 2027
URE announces next year’s rates by the end of October. All amounts are net of 23 % VAT.
| Consumer | 2026 | 2027 |
|---|---|---|
| Businesses billed per kWh (rate per kWh taken 7–22 on working days) | 0.2194 PLN/kWh | Q1 0.1925 Q2 0.2141 Q3 0.1984 Q4 0.1950 (PLN/kWh) |
| Flat rate, under 500 kWh a year | 4.29 PLN/month | 4.29 PLN/month |
| Flat rate, 500 to 1,200 kWh a year | 10.31 PLN/month | 10.31 PLN/month |
| Flat rate, over 1,200 to 2,800 kWh a year | 17.18 PLN/month | 17.18 PLN/month |
| Flat rate, over 2,800 kWh a year | 24.05 PLN/month | 24.05 PLN/month |
In 2027 the business rate differs by quarter for the first time. Compared with 2026 it is 12.3 % lower in Q1, 2.4 % in Q2, 9.6 % in Q3 and 11.1 % in Q4. Q2 is the most expensive, so every kWh taken off the peak is worth most then.
The flat rate applies to households and the smallest low-voltage consumers — according to the operators, tariff groups G and R, and C and O with contracted power up to 16 kW. Under the current wording of Article 89a, the split between flat and per-kWh rates covers periods up to the end of 2027. The rest of this page covers businesses billed per kWh.
When the capacity fee applies
The fee covers grid energy taken in 15 consecutive hours of each working day: the first starts at 7:00, the last at 21:00. In practice that is 7:00–22:00, Monday to Friday, excluding public holidays. In 2026 and 2027 the hours are the same in every quarter (URE Information No. 57/2025 and 50/2026).
Energy taken at night, at weekends and on public holidays is not charged. Since 2025, 24 December is also a public holiday. Both 2026 and 2027 have 253 working days.
The K1–K4 factor: what share of the rate a business pays
The operator compares the average hourly draw between 7:00 and 22:00 with the average in the other 9 hours of the same working day. The closer the two averages, the lower the factor. A plant that draws almost as much at night as during the day pays 17 % of the rate.
fee per day = factor A × grid energy taken 7–22 × rate
Capacity Market Act, Art. 70a(4). Difference s = (average draw 7–22 ÷ average draw in the other hours − 1) × 100 %.
| Band | Difference of averages | Factor A | Pays |
|---|---|---|---|
| K1 | below 5 % | 0.17 | 17 % of the rate |
| K2 | 5 % to below 10 % | 0.50 | 50 % of the rate |
| K3 | 10 % to below 15 % | 0.83 | 83 % of the rate |
| K4 | 15 % or more, or zero draw outside 7–22 | 1 | the full rate |
- The qualification period is one day, 0:00 to 23:59 (Art. 70a(3)). In one month some days can be K1 and others K4.
- The band is set separately for each metering point (Art. 70b(1)).
- If a plant draws more at night than during the day, the difference is negative — that is K1 too.
- Zero grid draw outside 7–22 means K4, even if daytime draw is very small.
Calculator: check your band and annual fee
Enter the average grid draw on a typical working day. The calculator shows the band, the fee per day and per year, and what a battery that moves part of the draw to the night would change.
- Fee per working day
- 819.46 PLN
- Fee per year 2026
- 207,323 PLN
Charges at night; 90 % round-trip efficiency. Moving an average of 5.7 kW, 86 kWh a day, is enough for K1.
Assumptions: every working day like the one entered, URE rates and working days per quarter, net amounts. Excludes the cost of charging energy and distribution charges — the full calculator covers those. Real load varies from day to day, so near a threshold the battery needs headroom and the control system has to watch every day.
Calculate the full battery business caseExamples: three plants in 2026
Figures assumed for the calculation. Rate 0.2194 PLN/kWh, 253 working days.
Three-shift plant: from K2 to K1
- Day: 300 kW average, night: 280 kW. Difference 7.1 % → K2, factor 0.50.
- Fee: 0.50 × 4,500 kWh × 0.2194 PLN = 493.65 PLN per working day, about 124,900 PLN a year.
- A battery supplies 150 kWh during the day and recharges at night. Day: 290 kW, night: 298.5 kW. Negative difference → K1.
- Fee: 0.17 × 4,350 kWh × 0.2194 PLN = 162.25 PLN per day, about 41,000 PLN a year.
About 83,800 PLN a year less. A small battery is enough — what matters is when it charges and discharges.
One-shift plant: stays in K4
- Day: 300 kW average, night: 60 kW. Difference 400 % → K4, full rate.
- Fee: 4,500 kWh × 0.2194 PLN = 987.30 PLN per day, about 249,800 PLN a year.
- An AIESS Pro 125 kW / 261 kWh supplies about 235 kWh during the day. The band does not change, but less energy is charged.
About 13,000 PLN a year less from the capacity fee alone. Here the battery earns mainly on energy prices and power peaks; the capacity fee is a bonus.
A battery that ignores the fee: from K1 to K4
- Day: 300 kW, night: 290 kW → K1. Fee 167.84 PLN per day.
- A battery run on prices alone charges 261 kWh from the grid at midday and supplies 235 kWh before 7:00, when energy is expensive.
- Day: 317.4 kW, night: 263.9 kW. Difference 20.3 % → K4. Fee: 4,761 kWh × 0.2194 PLN = 1,044.56 PLN.
One day 876.72 PLN more expensive. To win that back, every kWh supplied would have to earn 3.73 PLN on the price spread — 3,730 PLN/MWh.
How to cut the capacity fee
Move load outside 7–22
Forklift and EV charging, compressors running to a tank, cold storage, pumps. Every kWh moved leaves the fee base and raises the night average, which narrows the difference.
A battery run with the fee in mind
The battery supplies energy between 7 and 22 and charges at night. With a flat profile it moves the day into a better band; with a daytime profile it reduces the energy charged.
PV self-consumption
Solar energy used on site is not taken from the grid. It works mainly on sunny days — in winter the effect is small, and every day counts separately.
Combining metering points
Points connected by the customer’s own network and to the same operator can be combined on request. The band is then set from the total draw (Art. 70b). It pays when profiles complement each other — but can worsen a point that is flat on its own.
Watch the contracted power
Night-time charging adds to the plant’s load. Without power control at the connection point, an overrun charge can eat the capacity-fee saving.
Common mistakes
- Working from a monthly average. The band is set for each day, so the average can say K1 while half the days still land in K4.
- Charging the battery from the grid between 7:00 and 22:00 on working days. It enlarges the fee base and can worsen the band.
- Ignoring public holidays. 6 January, Corpus Christi, 11 November and 24 December carry no fee, and the control system has to know that.
- Adding load at night just to flatten the profile. Extra energy costs money — move processes that have to run anyway.
- Using last year’s rate. The rate rose 55 % in 2026; in 2027 it falls and changes every quarter.
AIESS EMS: the capacity fee as an optimization goal
The AIESS EMS algorithm treats the capacity fee as one of its optimization goals, alongside energy prices, contracted power and PV self-consumption, and keeps track of which K band each working day falls into. That is unique on the energy storage market: typical battery controllers optimize only prices or self-consumption and ignore the capacity fee.
- It tracks the current day: it computes average draw inside and outside 7:00–22:00 and keeps the day from slipping out of its target K band.
- It knows the working-day and holiday calendar and the fee hours for the year.
- It prices each day in its own K band and picks the cheapest variant it can reach.
- It never pushes a day into a more expensive band for a price-spread gain.
- It updates the plan every 15 minutes, so it reacts when the plant runs differently than usual.
Capacity fee rate history 2021–2027
| Year | Rate | Year on year |
|---|---|---|
| 2021 | 0.0762 PLN/kWh | — |
| 2022 | 0.1026 PLN/kWh | +34.6 % |
| 2023 | 0.1024 PLN/kWh | −0.2 % |
| 2024 | 0.1267 PLN/kWh | +23.7 % |
| 2025 | 0.1412 PLN/kWh | +11.4 % |
| 2026 | 0.2194 PLN/kWh | +55.4 % |
| 2027 | 0.1925–0.2141 PLN/kWh (quarterly) | −2.4 % to −12.3 % |
Capacity fee questions
Yes. The capacity fee is one of the optimization goals of the AIESS EMS algorithm, alongside TGE energy prices, contracted power and PV self-consumption. The system keeps track of each working day’s K band and never charges the battery in a way that would push the day into a more expensive band. That is unique on the energy storage market.
A charge that funds the capacity market — payment to power plants, energy storage and demand-response providers for being ready during peak demand. The distribution system operator collects it, and the President of URE sets the rates every year.
For businesses billed per kWh, 0.2194 PLN net per kWh taken from the grid on working days from 7:00 to 22:00. Flat-rate consumers pay 4.29 to 24.05 PLN net a month (URE Information No. 58/2025).
For businesses billed per kWh the rate is set per quarter: 0.1925 PLN/kWh in Q1, 0.2141 in Q2, 0.1984 in Q3 and 0.1950 in Q4. The flat rate is unchanged at 4.29 to 24.05 PLN a month (URE Information No. 51/2026).
In 2026 and 2027, 7:00 to 22:00 on working days — Monday to Friday, excluding public holidays. Energy taken at night, at weekends and on holidays is not charged.
For each working day, divide the average hourly draw between 7 and 22 by the average draw in the other 9 hours and subtract 1. Below 5 % is K1 (17 % of the rate), 5 to 10 % is K2 (50 %), 10 to 15 % is K3 (83 %), 15 % or more is K4 (full rate).
No. It cuts it when it supplies energy between 7 and 22 on working days and charges outside those hours. A battery run on prices alone can charge during the day and push the day into a more expensive band. AIESS EMS checks the band of every day and does not do that.
Yes, to the extent it reduces grid draw between 7 and 22. Exporting at midday does not reduce the fee by itself. In winter the effect is small.
No. The distribution system operator collects it at URE rates, whoever the supplier is.
Households and the smallest low-voltage consumers (groups G and R, and C and O up to 16 kW contracted power) pay a flat monthly rate. Other businesses pay per kWh taken between 7 and 22 on working days, multiplied by the K factor.
Sources
- Capacity Market Act of 8 December 2017 — consolidated text, Journal of Laws 2026 item 1400, Art. 70a, 70b, 89a (Polish)
- URE President’s Information No. 51/2026 — 2027 capacity fee rates (Polish)
- URE President’s Information No. 50/2026 — 2027 fee hours (Polish)
- URE President’s Information No. 58/2025 — 2026 capacity fee rates (Polish)
- URE President’s Information No. 57/2025 — 2026 fee hours (Polish)
- URE — capacity fee rates (history, Polish)
- TAURON Dystrybucja — capacity fee (flat-rate consumers, Polish)