How we work

We run the whole storage project: data, sizing, design, installation, commissioning and AI operation. At every step you know what we do, what we need and what you get.

The first step is free and needs no site visit.

  1. Data analysis

    What we do
    We rebuild your bill and simulate the battery.
    What we need
    12 months of meter data and an invoice.
    What you get
    A link to the calculation.
  2. Sizing and offer

    What we do
    We compare variants and set the model and contracted power.
    What we need
    A conversation about goals and constraints.
    What you get
    An offer with a schedule.
  3. Site survey and design

    What we do
    We inspect the site, connection and foundation, then design and agree it with the grid operator.
    What we need
    Site access and connection documents.
    What you get
    The design and the filings.
  4. Installation and commissioning

    What we do
    Delivery, setting, connection, AIESS EMS configuration and acceptance.
    What we need
    The site prepared to the design.
    What you get
    An acceptance protocol, training and app access.
  5. AI operation

    What we do
    A plan every 15 minutes, monitoring and price rules.
    What we need
    Nothing. From here on, it is our job.
    What you get
    The app, the AI plan and reports.
  6. Service and reports

    What we do
    Round-the-clock monitoring, inspections and warranty service.
    What we need
    Site access on inspection dates.
    What you get
    Savings reports and a service calendar.

One party answers for the result: AIESS. A certified partner from your region can do the installation.

  • AIESS

    • Analysis and sizing
    • Design and grid filings
    • AIESS EMS and the app
    • Reports and service
  • AIESS or a certified partner

    • Delivery and setting
    • Connection and acceptance
  • You

    • Meter data
    • Site access
    • Site prepared to the design

No. The battery works on the energy bill alone. PV adds another earning.

The schedule is in the offer, after the site survey. It depends on the model, the connection and civil works.

AIESS or a certified partner. Analysis, sizing, AIESS EMS and reports are always ours.

Don't see your question? Write to us

A free calculation shows whether a battery pays off before anyone visits the site.