PV energy exported to the grid is settled at its market value, not one-for-one against energy taken from the grid. A kilowatt-hour used on site avoids the energy purchase, distribution and — on working days from 7:00 to 21:59 — the capacity fee. That is why a company usually gains more by using PV energy than by selling it.

  • 219.40 PLN/MWhcapacity fee avoided at peak (2026)
  • 7:00–21:59capacity-fee hours on working days
  • 5 hnegative-price hours in the last 30 days

How exported energy is settled

Under net billing a prosumer no longer takes energy back from the grid in proportion to what was exported, as under the old offset scheme. Exported energy is credited at market value, while energy taken is bought at the full price, with distribution and charges.

A company that is not a prosumer sells its surplus under a supply contract, also at the market price. Either way, energy exported at a sunny midday is worth whatever the market pays that hour — sometimes very little, sometimes less than zero.

Thresholds and settlement details are set by the renewable-energy act and PSE notices. This page explains the principle, not specific rates.

What a kilowatt-hour used on site is worth

Energy used in the plant replaces a grid purchase. You save the energy price and every charge levied per kilowatt-hour taken. An example based on the 2026 Energa-Operator B23 tariff:

The same megawatt-hour exported earns only its market value in that hour. The gap is widest in peak hours, when the capacity fee applies.

What 1 MWh used on site avoids — example B23 tariff (2026, net)
ComponentPLN/MWhWhen
Energy priceper contractalways
Variable distribution — morning peak85.387:00–13:00
Variable distribution — afternoon peak105.1319:00–22:00 (Apr–Sep), 16:00–21:00 (Oct–Mar)
Variable distribution — other hours37.78rest of the day and days off
Quality charge33.16always
RES charge3.50always
Cogeneration charge3.00always
Capacity fee (factor 1)219.40working days 7:00–21:59
An example tariff, not a quote. Fixed per-kW charges left out.

Where a battery fits in

PV output peaks at midday, while a plant often also runs in the morning and evening. A battery moves the midday surplus to hours when grid energy would be expensive, instead of exporting it at a low price.

The flow diagram shows PV energy supplying the plant, charging the battery and only then reaching the grid.

Energy flows: PV, plant, battery and grid

The PV array delivers 180 kW and covers the plant. The 40 kW surplus charges the battery instead of going to the grid.

  • PV → Plant140 kW
  • PV → Battery40 kW

Example plant: 300 kW peak, 200 kWp PV, AIESS Pro 125/261.

An illustrative diagram. Pick a scenario to see where the energy goes.

Export limits and operator curtailment

Many installations have an export limit, and on sunny days PSE issues PV curtailment orders — in 2026, for example, 20–27 July and 1–7 September. Energy that cannot be exported is lost unless there is somewhere to store it.

A battery turns that energy into a reserve for the evening.

What AIESS EMS does

AIESS EMS compares the value of on-site use with the value of export in every quarter-hour.

  • It charges the battery with PV surplus when exporting it is worth less than using it later.
  • It stops export at a negative price and enforces the export limit.
  • It schedules discharge into capacity-fee hours and the evening peak.
  • It uses measured PV output and a weather forecast, recalculating the plan every 15 minutes.

Questions

It applies to prosumers. A company that is not a prosumer still sells surplus at the market price or loses it to an export limit — the “use it rather than sell it” rule works the same.

Yes, if the battery discharges on working days from 7:00 to 21:59 and reduces grid draw in those hours.

An analysis of your meter data shows how much energy you export and in which hours. The calculator works on 12 full months.

Sources

  1. Renewable Energy Sources Act (ISAP, Polish)
  2. PSE — PV installations and curtailment
  3. URE — capacity fee rates